We have been working on site at Dunbeg housing development, located just north of Oban, for over four years now as a sub-contractor for MacLeod Construction Ltd. Our works have involved the bulk excavation of material to allow the development of the housing project and the implementation of all drainage, access roads, parking and utilities alongside Scottish Water and SSE.
Some quick facts about our work on the housing development:
Take a look at some of the work we have completed on the development so far below.
- We have excavated and moved more than 500,000 tonnes of material to allow the development of the existing land.
- We have supplied and placed over 6,500 cubic metres of concrete for house foundations, floor slabs and kerb foundations.
- We have laid 6,000 metres of heel kerbs, and over 7,000 metres of road kerbs.
- We have supplied and laid over 27,000 square metres of block paving.
- We have laid over 12,500 square metres of tar-mac for roads and pavements.